FEES AND CHARGES

 Fees for Sealing and Licensing of Weights and Measure

Kind of Measuring Instrument

Amount of Tax per Annum

a) For sealing linear metric measurement:(1) Measures not over 1 meter

(2) Measures over 1 meter

22.00

55.00

b) For sealing metric measures of capacity:(1) Measures not over 10 liters

(2) Measures over 1 meter

22.00

55.00

c) For sealing metric instrument of weights(1) Capacity of not more than 30 kilograms

(2) Capacity of not more than 30 but not more

than 300 kilograms

(3) Capacity of not more than 300 but not more

than 3,000 kilograms

(4) Three Thousand (3,000) kilograms or more

55.00

82.50

110.00

137.50

 Mayor’s Permit Fee on Business

 (1) On manufacturer’s, assemblers, distributors, repackers, processor, brewers, distillers rectifiers and compounders of liquor, distilled spirits and wines or manufacturers of any article or commerce

200.00

(2) On wholesalers, distributors or dealers in any article of commerce

160.00

(3) On operators, manufacturers, millers and producers of essential commodities

120.00

(4) On wholesalers, distributors and dealers of essential commodities

80.00

(5) On retailers on any article of commerce

80.00

(6) On retailer of essential commodities

80.00

(7) On cafes, cafeterias, ice cream and other refreshment parlors, restaurants, soda fountain bars, carenderia or food caterers, bakery and bakeshops

160.00

(8) On business establishment principally rendering or offering services

80.00

(9) General Engineering, building and specialty construction filing, demolition and salvage work contractor

200.00

 (10) Persons engaged in the installation of water system and gas or electric lights, plating and lamination establishment, proprietor or operator of establishment for repairing, repainting, upholstering, washing or greasing of vehicles and any other business not mentioned above

80.00

(11) Proprietor or operators of hotels, motels, warehousing or forwarding establishment

160.00

(12) Banks and financial institutions

200.00

(13) Private owned market & malls

200.00

(14) Real estate dealer

160.00

(15) Private cemeteries and memorial parks

160.00

(16) Cold storage

160.00

(17) Wholesale/Retail dealer in foreign and domestic liquor

80.00

(18) Operator of corn mills

80.00

(19) Operator of rice mills (kiskisan type)

80.00

(20) Operator of rice mills (Cono type from 100 cavans to 300 cavans capacity)

120.00

(21) Operator of rice mills (Cono type from 400 cavans to 600 cavans capacity)

160.00

(22) Operator of rice mills (Cono type from 700 cavans to 1,000 cavans capacity)

200.00

(23) Lodging house

132.00

(24) Boarding house

88.00

(25) Amusement devices:Videoke

Family computer

200.00

176.00

(26) Amusement places:Day and Night club

Resort, swimming pool and other similar places

Cockpits (annually)

Special cockfighting (leagal Derby)

7,920.00

1,320.00

5,000.00

1,000.00

 PERMIT FEE ON BICYCLE

 

(a) Application Fee

10.00

(b) Permit and/or registration fee per bicycle

30.00

(c) Cost of plate (each)

20.00

(d) Pedaled tricycleMotorized less than 10HP

More than 10 HP

50.00

75.00

85.00

 REGISTRATION FEES ON FISHING BOATS AND MOTORBOATS

 

(1) Motorized with engine of less than 10 HP

75.00

(2) Motorized with engine of 10 HP or more

85.00

(3) Non-motorized

45.00

 REGULATORY FEE ON STORAGE OF COPRA, COPRA CAKE, ABACA HEMP AND OTHER RAW MATERIALS

 

(a) Copra or copra cake and abaca hemp, per capacity

0.10/cubic meter

(b) Dried ipil-ipil leaves, per kilo

0.03/cu.m.

(c) Other raw materials , per kilo

0.01/cu.m.

BUILDING PERMIT FEE

 

(1) Line and Grade:(a) Fronting road/creek

first 10 meters

for every meter in excess of 10m

(b) All other side per meter

50.00

0.50

0.25

(2) Building Permit(a) Category I – Residential-single detached dwelling unit devoted to the exclusive use of the owner/applicant

1. For construction, addition, renovation, fee based on

cost

2. For repair or alteration costing more than ₱ 500.00 but

less than ₱ 1,000.00

0.05%

50.00

      (b) Category II – Commercial and Industrial1. For construction, addition, renovation per sq. m. based

on cost

2. For repair or alteration costing not more than ₱ 500.00

in excess of 800.00 additional fee based on cost

1.5%

50.00

1.00

      (c) Category III – Social Institutional1. For construction, addition, or renovation based

on cost

2. For every meter or fraction thereof in excess of 8.0m

in height, fee per cubic meter of the part of the

building affected

3. Other permit fees for the following structures, auxiliary

Equipment and other appurtenances:

1. Each bank vault

2. Swimming pool, per square meter

3.Minimum charge for the erection of sign or billboard

4. For placing any sign announcing special

sale/service per sq. m. per month

5. Minimum charge for erection of any temporary

Cloth sign

6. Municipal Mayor’s Permit fee for every construction

1.5%

1.00

1,500.00

3.00

50.00

15.00

30.00

25.00

 FIRE INSPECTION FEE

 

(1) Sari-sari store and other business establishment of the same nature

50.00

(2) Factory or warehouse

100.00

(3) Construction or building plans processed to determine safety requirement

50.00

(4) Other business establishment and building for rent

75.00

(5) Gasoline stations

150.00

 PERMIT AND INSPECTION FEES ON PLUMBING

 

(1) Plumbing permit fee

20.00

     For every fixture in excess of a unit:Each water closet, lavatory and bath tub

Each floor drain, sink, grease trap, bidet

Each faucet/showerhead

Each urinal, drinking fountain, laundry tray, fountain

Sink, sterilizer, water meter

5.00

3.00

1.50

2.00

(2) Plumbing inspection fee:Every inspection of water meter

Every inspection of sewer connection

Connection of single fixture to the existing installation

10.00

5.00

3.00

 PERMIT AND INSPECTION FEES ON ELECTRICAL INSTALLATION

 

(a) Lighting and power systemFor each light switch/convenience outlet

For each remote switch

For each remote control master switch

1.00

1.00

2.00

(b) Additional fee for each of the following:(1) Appliances

Electric range

Refrigerator

Washing machine

Hair dryer

Electric fan

Electric typewriter/adding machine

2.00

2.00

2.00

3.00

2.00

2.00

     (2) Air conditioning systemFor each air conditioning outlet

2.00

 PERMIT AND INSPECTION FEES ON PIG PEN, COW/CARABAO CORAL, CHICKEN PEN

 

(a) Mayor’s permit

100.00

(b) Inspection fee

50.00

 PERMIT AND INSPECTION FEES ON FENCE CONSTRUCTION

 

(a) Mayor’s permit

100.00

(b) Inspection fee – annual

50.00

 WHARFAGE/DOCKAGE FEE

 

(a) Per registered gross ton for the first 24 hours

100.00

(b) Per registered gross ton the the succeeding 24 hrs

50.00

 Permit/Inspection Fees on animals

 

Mayor’s permit to transport

100.00

Large cattle per head

50.00

Hogs less than 50kg/headOver 50 kg/head

10.00

15.00

Fowls per dozen

10.00

Other animals per head

10.00

 INSPECTION FEE ON FISH, MEAT AND ANIMAL HIDE

 

Fish (fresh or dried) per box

10.00

Animal hide per kilo

1.00

Meat (fresh or Dried) per kilo

1.00

Bagoong (any kind or form) per tin can of five gallons

1.00

 POLICE CLEARANCE FEE

 

(a) Police ClearanceFor scholarship, employment and study grants

Other purposes herein not specified

For travel abroad

For firearms permit application

For change of name

For application for Filipino citizenship

50.00

50.00

300.00

100.00

50.00

300.00

 TAX CLEARANCE CERTIFICATE FEE

 

Tax clearance certificate for every business establishment, renewal of business permit (bonding) or other purposes

75.00

 ZONING/LOCATIONAL CLEARANCE SERVICE FEE

 I. ZONING/LOCATIONAL CLEARANCE

 

  1. Residential Structure single attached/detached, the project cost of which is:

 

  1. P 100,000 and below                                            P 100
  2. Over P 100,00                                  100+1/10 of 1% in excess of                                                                 P100,000

 

  1. Apartments
  1. Project Cost of P 500,000 and below    P 500
  2. Project  Cost over  P 500,000             P 500+1/10 of 1% in excess of

P500,000   regardless of the                                                                   number of doors

  1. Dormitories
  1. Project Cost of P 500,000 and below    P 500
  2. Project Cost over P 500,000               P 500+1/10 of 1% excess of

500,000  regardless of the  number of rooms

  1. Institutional, the project cost of which is:

 

  1. P 100,000 and below                         P 400
  2. Over P 100,000                                P 400+1/10 of 1% of cost in

excess of P 100,000

  1. Commercial, Industrial , Agro-Industrial, the project  cost of which is:

 

  1. P 100,000 and below                         P 100
  2. Over P 100,000                                P 1000+1/10 of 1% of cost in

excess of  P 100,000

 

  1. Special Uses/Special Projects, the project cost of which is:

 

  1. P 100,000 and below                         P 100
  2. Over P 100,000                                P 1000+1/10 of 1% of cost

In excess of P 100,000

 

  1. Alteration/Expansion (affected areas/cost of expansion only) same as original application

 

II. SUBDIVISION AND CONDOMINIOM PROJECTS/ACTIVITIES (under PD957)

 

  1. Approval of Application Plan(Including Town House)

 

  1. Preliminary Approval and Locational Clearance (PALC)
P 250/ha. For the first five hectares
a. For every additional hectare or a fraction thereof P. 100/ha
  1. Final Approval and Development Permit

 

P 1,200/ha. Regardless of density
     a. Add’l fee on floor area of house/building sold w/ the lot P 2.00/sqm
  1. Inspection Fee
P 500/ha Regardless of density-all applicants
  1. Alteration of Plans (affected areas only)
Same as Final Approval and Development Permit
  1. Certificate of Registration and License to Sell(per Salesable lot) Additional fee on floor area of house/bldg.sold w/ the lot
P 120/saleable lotP 10.00/sqm
  1. Certificate of Completion (per hectare)
P 500/ha. Regardless of density
  1. Approval of Condominium Project (under PD957)
  1. Preliminary Approval and Location Clearance(PALC)

a. Land Area

b .Building

 

P 500/ha

P 200/fllor

 

  1. Final Approval and Development permit

a.Per sq.m of the total land area

b.Additional cost on the area of the building

 

P 2.00

P 2.00

  1. Inspection Fee

 

P 10.00/sq.m of gross floor area for ETD, COC applicants P 2.00/sq.m additional
  1. Alteration (affected areas only
Same as Final Approval and Development Permit 
  1. Conversion (affected areas only) Development
Same an Final Approval and Permit
  1. Certificate of Registration and License to Sell

a. Residential (per sq.m of saleable area)

b. Commercial/Office (per sq.m of saleable area)

 

P 10.00

 

P 20.00

  1. Certificate of Completion
P 10.00/sq.m of gross floor area

 

 

 

III. PROJECT UNDER BP 220

 

  1. Subdivision

1.Preliminary Approval and Locational Clearnace

a. Socialized Housing

b. Economic Housing

For every additional hectare or a fraction thereof

a. Socialized Housing

b. Economic Housing

 

 

P 70.00 for the first ten(10) has.

P 100/ha for the first five(5) ha.

 

 

P 20.00

P 50.00

          2.Final Approval Development Permit P 200.00/ha 
3.Inspection Fee

a. Socialized Housing

b. Economic Housing

All Applicants (DP, CRLS, ETD, COC, etc.)

P 110/ha

P 200/ha

          4.Alteration of Plan (affectedareas only) P 200/ha

     5.Building Permit (per sq.m of floor

           area of housing unit)

P 2.00/sq.m.
          6.Certificate of Registration and License to sella.Socialized Housing

b.economic Housing

Additional Fee o floor area of houses/building Sold with lot

 

P 10.00/lot/unit

P 10.00/lot/unit

P  2.00/sq.m

7 Certificate of Completion (per ha. of a fraction of land area) P 150/ha
8.Certificate of Occupancy (per sq.m. of the floor area of the housing unit) P 2.00
  1. Condominium
    1. Preliminary Approval and Locational Clearance
    2. Final Approval and Development Permit

a.Per sq.m. of total land area

b.Additional Cost per sq.m of saleable floor area

 

P 200.00

 

 

 

P 2.00

P 2.00

  1. Inspection Fee
All applications: (DP,CRLS, ETD, COC,etc.)P 2.00sq.m saleable area
  1. Alteration of Plan (affected areas only)
Same as Final Approval and Dev’t Permit
  1. Building Permit (per sq.m of housing unit)
P 2.00
  1. Certificate of Registration and License to Sell
P 5.00/sq.m. of saleable area
  1. Certificate of Completion
P 5.00/sq.m of saleable area
  1. Certificate of Occupancy
P 2.00/sq.m of saleable area

 

 

IV. APPROVAL OF INDUSTRIAL SUBDIVISION

 

 

  1. Preliminary Approval and Locational Clearance
    1. First Five hectares
    2. Every additional hectare or a fraction thereof
 

P 300.00/ha

P 100.00/ha

  1. Final Approval and Development permit
P 1,000/ha regardless of location
  1. Inspection Fee
All applicants: (DP,CRLS, ETD, COC, etc)P 1,000/ha regardless of location
  1. Alteration of Plan (affected areas only)
Same as Final Approval and Development Permit
  1. Certificate of Registration and License to Sell
P 1.00/sq.m. of the land area
  1. Certificate of Completion
P 100/ha. Regardless of location

 

 

V. APPROVAL OF COMMERCIAL SUBDIVISION

 

  1. Preliminary Approval and Location Clearance
    1. First two(2) hectares
    2. Every Additional hectares
 

P 300/ha

P 100/ha

  1. Final Approval and Development Permit
P 5,000/ha regardless of location
  1. Inspection Fee
All Applicants: (DP, CRLS, ETD, COC, etc.)P 500/ha regardless of location
  1. Alteration of Plan(affected Areas only)
Same as Final Approval and Development Permit
  1. Certificate of Registration and License to Sell (CRLS) (per sq.m of land area
P 2.00
  1. Certificate of Completion (COC)
P 500/ha. Regardless of location

 

 

 

VI. APPROVAL OF FARMLOT SUBDIVISION

 

  1. Preliminary Approval and Locational Clearance

1.For the first five (5) hectares

2.For every additional hectares

 

P 200/ha.

P  50/ha

  1. Final Approval and Development Permit
P 500/ha
  1. Inspection Fee
All Applicants: (DP, CRLS, ETD, COC, etc.)
  1. Alteration of Plan (affected areas only)
P 500/ha
  1. Certificate of Registration and License to Sell
P 500/saleable lot
  1. Certificate of Completiotion
P 300/ha

 

 

VII. APPROVAL OF MEMORIAL PARK/CEMETERY PROJECT

 

  1. Preliminary Approval and Locational Clearance
    1. For memorial project
    2. For cemeteries

Every additional hectare of a fraction thereof

  1. Memorial Project
  2. Cemeteries
 

P 500 for the first hectares

P 200 for the first hectares

 

 

P 100/ha

P  50/ha

  1. Final Approval and Development Permit
    1. Memorial Projects
    2. Cemeteries
 

P 2.00/sq.m.

P 1.00/sq.m.

  1. Inspection Fee

1.Memorial Projects

2.Cemeteries

All Applicants: (DP, CRLS, ETD, COC, etc.)P 500/ha

P 100/ha

  1. Alteration of Plan (affected areas)
Same as Final Approval and Development Permit
  1. Certificate of Registration and License to Sell (per saleable plot)
    1. Memorial Projects
    2. Cemeteries
 

P 50/2.5 sq.m

P 10/2.5 sq.m

  1. Certificate of Completion
    1. Memorial Projects
    2. Cemeteries
P 200/ha

P 100/ha

 

 

VIII. OTHER TRANSACTIONS/CERTIFICATIONS

 

  1. Application /Request for:
    1. Advertisement Approval
    2. Cancellation/Reduction of Performance Bond
    3. Lifting of Suspension of License to Sell
    4. Extension of Time to Complete Development
    5. Exemption from Cease and Desist Order
    6. Clearance to Mortgage
    7. Lifting to Cease and Desist Order
    8. Change of Name/Ownership
    9. Voluntary cancellation of CR/LS

10. Revalidation/Renewal of Permit (condominium)

P 200.00

P 350.00

 

P 350.00

 

P 350.00

 

P  50.00

 

P 350.00

P 350.00

P 350.00

P 350.00

50% of original fee

  1. Other Certifications
    1. Zoning Certifications
    2. Certification of Town Plan/Zoning ordinance approval
    3. Certification of New Rigths/Sales
    4. Certification of Locational Viability
    5. Certificate of Registration and License to Sell (form)
    6. Others to include:
      1. Availability of records/public request of copies research works
      2. Certification of no records on file
      3. Certification of with or without CR/LS
      4. Certified true/Xerox copy of documents

1.Document of five (5) pages or less

2.Every additional page

C. Others

P 250/ha

 

P 100.00

P 100.00

P 250.00

P 100.00

 

 

P 100.00

 

 

 

P 100.00

 

P 100.00

 

 

 

P  30.00

 

P    3.00

P 100.00

 

 

IX. Registration of Dealers/Brokers/Salesmen

 

  1. Dealers/Broker
  2. Salesmen/Agent
P 500.00P 200.00

 

 

X. Legal Fees

 

  1. Complaint/Opposition, where aggregate claim (for Refund, damages, Attorney’s fees, etc.) is:
    1. Not more than P 20.00
    2. More than P 20,000 but less than P 40,000
    3. P 40,000 or more but less than P 60,000
    4. P 60,000 or more but less than P 80,000
    5. P 80,000 or more but less than P 100,000
    6. P 100,000 or more but less than P 150,000
    7. For each P 1,000 in excess of P 150,000
 

 

P 120.00

P 150.00

 

P 200.00

 

P 250.00

 

P 400.00

 

P 600.00

 

P     5.00

  1. Petition for Review
P 1,000.00

 

SERVICE FEE FOR GABAGE COLLECTION

    (b) On wholesalers, distributors or dealers In any form, of commerce 70.00
    (c) On exporters, wholesalers, distributors, dealers or retailers of essential commodities 40.00
    (d) On contractor and other independent contractor 75.00
    (e) On Retailers:

1. Sari-sari Store (small)

2. Sari-sari Store (big)

3.Bazar,groceries, drugstores department stores, etc.

4. Others

50.00

60.00

75.00

 

75.00     (f) On eating places like café, cafeterias, Restauranst and similar establishment85     (g) On service business establishment, financial institution, amusement places, lodging places, etc.100.00     (h) On all other establishment not mentioned above75.00

 

SLAUGTHER PERMIT AND POST MORTEM FEE

(a)  Slaugther Permit Fee:

Large Cattle pe head

Hogs, per head

Less than 50 kilos

Over 50 kilos

Other animals (such as but not limited to goats, sheep, etc.

100.00

 

30.00

50.00

15.00(b)  Slaugther fee: There shall be paid fee to cover the cost of services in the slaughter of animal at the Municipal Slaughter of animal at the municipal Slaughterhouse, in accordance with the following rates:

  1. For Public consumption:

Large cattle, per head

Hogs, per head

Other animals, per head (such as But not limited to goat, sheep, etc.)

  1. For Home consumption, per head:

Large cattle

Hogs

Other Animals

 

 

 

 

 

 

20.00

15.00

5.00

 

 

 

15.00

12.00

5.00(c)  Coral fee, per head, per day:

Large cattle

Hogs

Other Animals

5.00

5.00

2.00

MUNICIPAL CEMETERY CHARGES

(a)  Rental fee for each burial

Lot consisting of 1×2 square meters of fraction thereof for a lease period of five (5) years.

500.00(b)  Rental fee, per year for five (5) years of the niche or apartment type surrounding the cemetery1,000.00

REGISTRATION FEE FOR OPERATION OF MOTORIZE TRICYCLE

a.)  Application Fee

b.)  Mayor’s  Permit

c.)  Supervision Fee

d.)  Franchise Fee

e.)  Franchise Certificate Fee, each

f.)   Cost of Plate

g.)  For each additional unit of tricycle  50.00

100.00

50.00

300.00

30.00

60.00

50.00

MARKET FEES

  1. Fish Section- All kinds of fish, clams oysters, shrimp and marine products.
  2. Meat Section- All kinds of fresh meat from cow, hog, carabao, horse, goat, fowl and swine.
  3. Fruit and Vegetable Section- All kinds of fruits, root crops, and vegetables.
  4. Grocery and Sari-sari Section- All kinds of cakes, butter, cheese, confectionaries, candies, canned, or bottled foods, flour, rice, corn, oatmeal, onions, garlic, mongo, salt, soap, etc., soft drinks and other household items, including charcoal and firewood, coffe and sugar.
  5. Native Craft Section- All kinds of native products, wood carving, woven baskets, mats, hats, bags, all kinds of handicrafts, figurine, shells, craft and other items.
  6. Service Section- All kinds of business that offer and render services such as barbershop, beuty parlors, boutique, dress shop, botica/drug store, tailor shop and the like.
  7. Dry Goods Section- All kinds of textile, novelties, ready made dress and apparels, office supplies, and other similar items.
  8. Eateries and cooked Food Section- All kinds of cooked food including refreshment, halo-halo, ice cream, restaurants, café, and cafeteria, carenderias, and fast food centers.
 
  1. Fish Section/sq.m./day
  2. Meat Section/sq.m./day
  3. Fruit and Vegetable Section  1-A

1-B

1-C

  1. Grocery and Sari-sari Section 1-A

1-B

1-C

  1. Native Craft Section 1-A

1-B

1-C

  1. Service Section 1-A

1-B

1-C

  1. Dry Goods Section 1-A

1-B

1-C

  1. Eateries and Food Section 1-A

1-B

1-C

10.00

15.00

5.00

4.00

3.00

8.00

7.00

6.00

8.00

7.00

6.00

8.00

7.00

6.00

10.00

8.00

6.00

10.00

8.00

6.00